About McRae Correctional Facility:Â
BELLacted as the Construction Manager at Risk on this project. Extensive value engineering was performed to realize a total project savings in excess of $1.1 million. Value engineering opportunities incorporated into the project included utilizing a pre-engineered metal building system in lieu of the Owner’s preliminary design of a structured fabric system, utilizing precast concrete cells versus a metal panelized system saved both cost and time on the fast track project.
The project was completed within the perimeter security fence of the existing facility requiring constant communications between ²ÝÝ®´«Ã½, CCA, the Federal Bureau of Prisons, and the facility’s Warden. To minimize disruption to ongoing operation of the existing facility, ²ÝÝ®´«Ã½’s team coordinated with the Owner’s staff to perform demolition in unoccupied areas at night.
The scope of work for the project included a new 32,400 SF, 400-bed dormitory, a 26,000 SF expansion of the existing segregation unit, commissary, chapel, support services, intake, kitchen and dining, and visitation.
McRae Correctional Facility details:Â
Projects are made of and can be measured by three major components: time, scope, and money. I am very proud that the McRae team delivered on all three.
Chris Murphree - CoreCivic
Shelbyville, Tennessee
Cookeville, Tennessee
Wartburg, Tennessee
Project Executive & Member
Executive Vice President, Building Division & Member